Over the last four years, UNIMAR has enjoyed rapid growth in the marine, oil, gas, and mineral sectors, and prides itself on employing a comprehensive and effective health, safety and environmental management system. Following is a list of recent projects.
| Date |
Project |
Pers. |
Hrs (est.) |
| Oct 11 – |
MV Rena Grounding – Astrolab Reef – Bay Of Plenty |
TBA |
TBA |
| Engaged by Svitzer Salvage to provide 150T Bollard Pull DP2 AHTS to assist in the Salvage Operation of MV Rena. UNIMAR chartered the vessel GO Canopus. |
Aug 11 – Sep 11 |
Dry Dock of Marsol Pride – Lyttleton |
50 |
11,500 |
| Marsol Pride was dry docked for scheduled repairs prior to being mobilized to Dubai for change in ownership. |
Jun 11 – Jul 11 |
Noble Drilling – LRMP Recovery Operation |
50 |
12,600 |
| Contracted by Noble Drilling Corp to provide Marsol Pride with ROV and Equipment Spread to assist with the recovery of the LRMP after the Drillship broke from its moorings. |
Jan 11 – May 11 |
STOS / AWE – Subsea Assets Inspection Program |
45 |
48,600 |
| UNIMAR were subcontracted by Fugro BTW to provide Marsol Pride for STOS / AWE Subsea Assets 2011 Inspection Program. Marsol Pride was mobilized with full Work Class ROV spread. |
Jul 10 – Aug 10 |
AWE New Zealand – Tuatara Drilling Program |
40 |
16,000 |
| Engaged by AWE to provide Marsol Pride as Emergency Response Vessel during the AWE Tuatara Drilling Campaign off D’Urville Island – South Island New Zealand. Vessel was equipped with Fugro ROV for Wellhead Subsea Intervention capability and Maritime NZ Pollution Control Equipment. |
May 10 – Jun 10 |
AWE New Zealand – Tui Field Sub Sea Assets Inspection Program |
40 |
14,000 |
| Appointed Lead Contractor for AWE’s Tui Field Inspection Program. UNIMAR sub-contracted Fugro-BTW to provide full Work Class ROV Spread and this was installed on UNIMAR vessel Marsol Pride. |
Oct 09 – May 10 |
De Beers Marine – Sea Bed Core Sampling - West Coast South Island |
50 |
25,000 |
| Engaged by De Beers Marine as South Island Service Provider during the establishment and execution of their Alluvial Core Sampling Campaign. UNIMAR provided engineering fulfillment and fabricated a complex Heave Compensated LARS System. UNIMAR also provided the campaign vessel MPV Marsol Pride. This was Marsol Pride’s first project after UNIMAR took delivery of her February 2010. |
May 08 – Jan 09 |
OMV Temporary Mooring |
– |
– |
| UNIMAR supplied and imported additional Temporary Mooring Leg for ENSCO 107. |
Apr 08 – Jul 09 |
Samoa Ports Authority |
3 |
2,720 |
| Engaged by the Samoan Government to engineer and oversee the installation of 700T Slipway in Apia. |
Jan 08 – Aug 08 |
OMV / Clough Maari WHP |
250 |
49,618 |
| Engaged by Clough to manage the arrival, float-off and assist with installation of the Maari Well Head Platform. Provide temporary mooring spread and personnel to MV Far Grip to install mooring for WHP in Admiralty Bay. UNIMAR directly provided In-Field Support Vessel ‘Yarabah’ and Construction Support Vessel ‘Island Passage’ for the installation and hook-up phase operated from New Plymouth. Managed the importation and demobilisation of HLV Blue Marlin, mobilisation of Wet Tow Tugs ‘Salveritas’ and ‘Salviceroy’. This included all visa and entry documentation and procedures required by NZ Customs, MAF and Bio-Security. Temporary Support Bases were established in Nelson and French Pass and local resources, plant and equipment were integrated into the supply chain during this phase of the project. All hours audited. No LTIs. Mobilised and fitted out Geo Bay for strand recovery. This involved fabricating carousel, installing deck winches and commissioning equipment. |
Dec 07 – Feb 08 |
Technip – Rockwater II – Temporary Mooring Leg |
– |
– |
| Supply temporary mooring leg for Rockwater II during spooling operations at Picton’s Shakespeare Bay. |
Aug 07 – Mar 08 |
Technip – Ensco 107 Temporary Mooring System |
– |
– |
| Import and supply a 4-leg Temporary mooring spread for Ensco 107 / barge. |
Oct 06 – May 07 |
AWE – Tui FPSO Installation |
40 |
7,500 |
| UNIMAR was engaged by AWE as In-Country Manager for the management and crewing of Construction Vessel – Normand Installer. Imported, unloaded, set-up and mobilised to Normand Installer 9-leg permanent mooring system for FPSO. UNIMAR also set up and operated the supply base and provided additional temporary mooring for the Roroa FPSO. Provision of skilled labour, stevedores, engineering and back deck crew during the installation phase. |
| Oct 06 |
Technip - Kupe Pipeline Survey |
10 |
2,500 |
| UNIMAR were appointed subcontractor to Technip to undertake seabed survey. Chartered NIWA vessel MV Kaharoa, sub-contracted diving company and Fugro-BTW and produced bio-metric report and visual diver video footage. |
Dec 05 – Jan 06 |
Swire Pacific Chieftain – Refit |
100 |
21,000 |
| Refit was carried out at our dry-dock facilities in Nelson, NZ. UNIMAR was the managing contractor. |